The one picture on this post is to show how creative our group can be. Inside the house when we are working there are multiple things going on. It gets very loud and hard to hear and work. The major noise maker is the air composer. It turns on and we can't hear anything and even when it is put in the garage it is still loud. So this is what they come up with. It works great.
Wednesday, January 7, 2009
Leads up to...
Finish work. We are about 1/3 done with the finish work in our house. Finish work includes: hanging inside doors, regular and closet, putting in window seals, casing around all the doors, putting in closet organizers, baseboards, and puttying and caulking all of those things. This then gets it ready for painting. I will post pictures when we have it all done.
The one picture on this post is to show how creative our group can be. Inside the house when we are working there are multiple things going on. It gets very loud and hard to hear and work. The major noise maker is the air composer. It turns on and we can't hear anything and even when it is put in the garage it is still loud. So this is what they come up with. It works great.

The one picture on this post is to show how creative our group can be. Inside the house when we are working there are multiple things going on. It gets very loud and hard to hear and work. The major noise maker is the air composer. It turns on and we can't hear anything and even when it is put in the garage it is still loud. So this is what they come up with. It works great.
House Wrap
This would have been a great post for Christmas, wrapping a house like wrapping a present. This is a long time coming. We wrapped the house with this plastic stuff, that protects it from moisture. We do this right before the siding company is ready to side our house. Our house is the last one to get wrapped so it is nice to almost get done. But as you can see from the pictures below we are not done with it because that side wall has some wavy issues that we have to have fixed. The siding company is going to do that so it won't put us more behind. It is just a very slow process and we can't wait to have the siding put up.

Dry Wall done
Thursday, December 11, 2008
Insulation and drywall
It has been so exciting this last week. Our insulation was put in and the dry wall is being hung. As a group we also started a new chapter in working on the house and is always referred to as finish work. It doesn't mean we are super close to finishing but a lot closer than before. It so far is a good turn of pace. Sorry about the quality of the photos I took then when it was dark and we only have a few lights in there.

This is the living room. This insulation is really neat- it is blown in with water and adhesive and the actual insulation is recycled little pieces of newspaper. It is great energy efficient insulation.

Back of the garage, door on the right is the furnace/water heater, and the left door goes into our utility room and kitchen.
Main hallway with the drywall up. The door straight ahead is the main bathroom.

One of the bedrooms, looking into the closet.
This is the living room. This insulation is really neat- it is blown in with water and adhesive and the actual insulation is recycled little pieces of newspaper. It is great energy efficient insulation.
Back of the garage, door on the right is the furnace/water heater, and the left door goes into our utility room and kitchen.
One of the bedrooms, looking into the closet.
Sunday, December 7, 2008
Major inspection...
Progress and been going very quickly even though it is not progress we are doing but progress contractors have been making. In the last two weeks things that have be done are, the plumbing, the electrical, the insulation in the outside walls and dry wall on the celling. It also seems to get done quickly and without input really from us. We were just so happy to have it get done and be that much closer.
Things we have done on the houses are just a lot of little things that had to be done before the next stages. A few of them are:
- had to put in a few small walls in the bathroom next to the tubs
- add boards around the windows if the gap was wider than the wafer board (on Thursday I spent most of the evening finding the table saw and cutting the strips)
- getting backing done for dry wall
- painting the trim around the outside doors
- fixing a hole that was accidentally shingled over on our roof, that then had to be corrected when the plumbers come in(thanks Dad and Garth)
-sealing and masking the air duct work (it helps with the energy star rating that our home should get when it is done)
-adding a few things here and there, that got overlooked before
- and a lot of clean up.
I think that is everything but I could have missed something. It is great to be moving on to an other section of building. We will be starting finish work on the first couple of houses and it will all be inside, yeah for heat when it is getting so cold.
Things we have done on the houses are just a lot of little things that had to be done before the next stages. A few of them are:
- had to put in a few small walls in the bathroom next to the tubs
- add boards around the windows if the gap was wider than the wafer board (on Thursday I spent most of the evening finding the table saw and cutting the strips)
- getting backing done for dry wall
- painting the trim around the outside doors
- fixing a hole that was accidentally shingled over on our roof, that then had to be corrected when the plumbers come in(thanks Dad and Garth)
-sealing and masking the air duct work (it helps with the energy star rating that our home should get when it is done)
-adding a few things here and there, that got overlooked before
- and a lot of clean up.
I think that is everything but I could have missed something. It is great to be moving on to an other section of building. We will be starting finish work on the first couple of houses and it will all be inside, yeah for heat when it is getting so cold.
Wednesday, November 26, 2008
Rock conclusion
Sunday, November 16, 2008
Doors
This week we had Doors put in. The first one that went in was our garage door and no we didn't have to install it. Second set was all our outside doors. I didn't help with this but it is hard to do it seems. A funny thing about our group and doors is that several of us all choose the same style of door, we must have similar taste. 
The weather has been rough so we haven't been working out side as much these last two weeks. We did get a lot of the house prepared for installation and dry wall though. I have been working on a lot of backing which is putting pieces of wood on top of walls in between rafters so that when the dry wall is put in they have something to nail to, or a back support (backing). I didn't take any pictures because I think it is boring and it is hard to tell that anything has been done. Also we finally have our furnace installed. They were suppose to put it in weeks ago but got to it this Friday. We won't have it turned on just yet but as soon as the electrical and plumbing are done it can be turned on, heat inside on cold days, it will be so nice.